Showerthought: My 6-month-old panel install in Tucson got fried by a loose neutral and I blamed the surge protector first | Alarm System Installers - nhfree.com
Showerthought: My 6-month-old panel install in Tucson got fried by a loose neutral and I blamed the surge protector first
Spent 45 minutes swapping the surge module before my meter showed the real culprit was a neutral bar screw I never torqued down, so now I want to know if anyone else keeps a checklist for panel terminations or if I'm just being paranoid.