That Tuesday in Mesa where every single job went right for once
Back in 2016 I knocked out four installs in one day in Mesa with zero callbacks, which never happened. First house had the drop ceiling already open, second guy had his own ladder out and coffee waiting, and the third had the coax fished before I even got my drill out. I finished by 4:30 and sat in the truck eating a gas station burrito feeling like a champ. Seems like these days I'm lucky to get two done without some surprise, so what's your best run ever look like?