Shoutout to the 1890s plaster in my Syracuse foursquare, which ate up 11 weekends of my life
When I bought my 1894 house near Syracuse for $38,000, the living room ceiling looked like it just needed a coat of paint. I pulled one loose chunk and the whole thing came down in sheets, so I ended up redoing it with plaster washers and a base coat instead of drywall. It took 11 weekends and about $260 in materials, mostly because I kept finding new cracks after each skim coat. I also learned the hard way that the old horsehair plaster needs way more drying time than the bucket says. Curious if anyone here has gone with veneer plaster over a full tear-out and whether it was actually faster.
Veneer plaster is way faster once the old stuff is off, the base coat sets in a day and you can skim right over it. But those horsehair walls in an 1894 foursquare are never flat, so you lose some of that speed fixing the dips first. Eleven weekends sounds about right for Syracuse plaster, that stuff is like concrete.