A smoke test at the Bellvue job blew my panel mapping habit apart
I was finishing a 12-zone panel swap in Bellvue and did my usual smoke test with canned smoke, and zone 7 fired off two rooms away from where I labeled it. Turned out the old installer had crossed two wires in the crawlspace and my labels were copies of his mistakes. Now I walk every zone with the homeowner watching before I write a single label, and does anyone else here map zones with the client standing next to them or am I overdoing it?