Showerthought: 1,247 tube ends rolled before I finally got a leak free job
Kept a tally on my hard hat for 6 months and hit 1,247 rolled tubes before a hydro test came back dry on the first try. The trick was not the roller setup at all, it was reaming the tube sheet holes by hand every single morning before the shift started. Anybody else keep count of something dumb like this just to see if the next job goes smoother?