Thought I'd save time welding a 3/16 rod uphill on that hogger shell, got a lesson instead
Gave it a shot on a tube sheet job in Gary two weeks back and blew a hole clean through on the first pass. Turns out the rod was pulling heat faster than I could move and the puddle just caved. Anyone else run into this with thinner shell plate or was it just me rushing the root?