Just realized why half the cabinet doors I see in new builds don't close right
I keep seeing guys hang uppers with the hinge screws driven straight into the back of the face frame before the case is even shimmed level. When I re-did a kitchen on Maple Street in Lansing a few weeks back, three of the uppers were off by almost 3/16 of an inch because somebody screwed hinges on first and shimmed second. It matters because you're fighting the box the entire time and the door never sits flush no matter how much you tweak the plates. How are you all sequencing it, hinges last or do some of you set them early and adjust?