PSA: A crash at the machine shop in Dayton taught me to check my G-code before hitting cycle start
Last Thursday I was running a batch of aluminum brackets at a shop over on Third Street in Dayton, and I hit cycle start without checking the first tool path. The tool drove straight into the vise jaw at 40 inches a minute and snapped a 3/8 end mill, and the vise took a deep gouge that cost me about $90. I stood there for a minute just staring at it because I had run that same program maybe 20 times before with no issues. Turns out I had edited the Z clearance the night before and saved over the good file. Now I dry run every program with the tool 2 inches above the part and watch the first 30 seconds before I walk away. It adds three minutes to a setup but it beats buying end mills and vise jaws. Has anyone else ruined a part because of a small edit to a file they thought was fine?