Showerthought: my probe tip snapped 20 minutes into a 6 hour roughing pass and I just stood there
Last Tuesday I was running a big 4140 block on the old VF-2 and my indicator probe tip snapped clean off about 20 minutes into setup. I had already checked the first corner twice and it read fine, so I got lazy and skipped re-zeroing. Spent the next 45 minutes re-dating every single offset while the spindle sat there cold, and the part still came out 3 thou off on the back pocket. I mean it was salvageable, but the boss walked by and asked why the machine was quiet for so long. How often do you all re-probe between ops on a long run, or do you just trust the first touch?