Saw a crew pouring a 60 foot sidewalk in Peoria and their screed setup stopped me cold
I was up in Peoria last Saturday visiting my sister and drove past a crew finishing a sidewalk pour along a strip mall, and they had a homemade screed rig on a pipe that looked dead simple. Their edge work was cleaner than mine on a much bigger pour, and I stood there long enough that my sister asked what I was staring at. Anybody here ever seen a screed setup like that, or am I overthinking a basic pipe and a couple of brackets?