26
That day I showed up to a framing job and the lumber was all delivered 2 inches short
Had to stop everything, call the yard in Richmond, and wait 4 hours for a redelivery while the crew just stood around on the clock, and now I double-check every single board length before I even load my truck because that mistake cost me $800 in wasted labor.
2 comments
Log in to join the discussion
Log In2 Comments
spencer_chen61mo ago
Yeah, "2 inches short" - I gotta call that out. In my experience lumber mills cut to nominal sizes, so a 2x4 is really 1.5x3.5, but if they sent actual 2 inch shorts that means they cut the wrong lengths entirely. That's a whole different level of screwup. Your yard should have caught that on the order sheet before it ever left the lot. Stuff like that makes me wonder if the person pulling the order was new or just having a bad day.
4
karen4101mo ago
Wait, so you're saying they actually cut them 2 inches short on the length too? That's rough. I feel for anyone dealing with that mess, @spencer_chen6. I've had lumber yards send me stuff that was clearly off the wrong pile before, and it always sets the whole project back a day. Hope you get it sorted without too much hassle.
7