Just realized I was over-correcting my load swings for 8 years straight
Was running a 50-ton Grove on a tight jobsite downtown and a senior operator told me to let the load find its own rhythm instead of fighting every wobble with the boom, and it cut my setup time by half, so who else learned they were making the job harder by doing it the way they thought was right?