They said it over coffee after I'd already waited 30 days past the invoice date. How do you handle that kind of talk without losing the job?
I was down there grabbing a tool when I heard a loud pop and saw water spraying everywhere from the PVC connection. I had to cut the power, dry the area, and use a new stainless steel hose clamp to secure it properly. What's the best way to check these connections before they fail?