Took me 3 hours to level a 50 ton crawler because I forgot one step
Last week I was setting up for a big lift at a job site near Pueblo. Got the crawler on site, started leveling the tracks, and everything was off by almost 2 degrees. Kept adjusting jacks, moving pads, sweating in the sun for like 90 minutes. Foreman walks over and just points at the ground - I had parked on a soft patch and the tracks had sunk uneven while I was messing with the outriggers. Had to move it 20 feet, re-set the whole thing, and it leveled in 20 minutes flat. Has anyone else had a dumb setup detail eat up way more time than the actual lift?