Leveling a workbench took me 6 hours because I skipped one dumb step
I built a new workbench last month and spent an entire Saturday trying to get it level. Adjusted the legs over and over, shimmed one corner, then another, got it perfect, then came back the next day and it was wobbling again. Turns out I never tightened the bolts on the cross braces first. Had to undo everything, tighten those, then level it again. Took maybe 45 minutes the second time around. Anyone else wasted a whole day on something that had a simple fix right in front of them?